Standard

OPTIMIZING ROLLING SCHEDULE FOR CHANNEL NO 12 ON 600 MILL. / Shilov, V. A.; Fomin, A. V.; Telyashov, N. V. и др.
в: Steel in the USSR, Том 20, № 4, 1990, стр. 188-190.

Результаты исследований: Вклад в журналСтатьяРецензирование

Harvard

Shilov, VA, Fomin, AV, Telyashov, NV, Bodrov, EM & Krivoruchko, NN 1990, 'OPTIMIZING ROLLING SCHEDULE FOR CHANNEL NO 12 ON 600 MILL', Steel in the USSR, Том. 20, № 4, стр. 188-190.

APA

Shilov, V. A., Fomin, A. V., Telyashov, N. V., Bodrov, E. M., & Krivoruchko, N. N. (1990). OPTIMIZING ROLLING SCHEDULE FOR CHANNEL NO 12 ON 600 MILL. Steel in the USSR, 20(4), 188-190.

Vancouver

Shilov VA, Fomin AV, Telyashov NV, Bodrov EM, Krivoruchko NN. OPTIMIZING ROLLING SCHEDULE FOR CHANNEL NO 12 ON 600 MILL. Steel in the USSR. 1990;20(4):188-190.

Author

Shilov, V. A. ; Fomin, A. V. ; Telyashov, N. V. и др. / OPTIMIZING ROLLING SCHEDULE FOR CHANNEL NO 12 ON 600 MILL. в: Steel in the USSR. 1990 ; Том 20, № 4. стр. 188-190.

BibTeX

@article{574c37491e81404c8b4dc3c2f5c34feb,
title = "OPTIMIZING ROLLING SCHEDULE FOR CHANNEL NO 12 ON 600 MILL",
abstract = "A procedure is proposed for optimising the rolling schedule for channel No. 12 on a 600 mill consisting of three three-high stands and a two-high finishing stand. A computer program was used to determine the actual pressure and force load on the mill equipment and to establish the reserves for intensifying the rolling schedule. Computer simulation made it possible to determine the optimum pass overlapping schedule and to increase mill throughput. Schedules for rolling sections and shapes on any linear mill can be optimised by the procedure described.",
author = "Shilov, {V. A.} and Fomin, {A. V.} and Telyashov, {N. V.} and Bodrov, {E. M.} and Krivoruchko, {N. N.}",
year = "1990",
language = "English",
volume = "20",
pages = "188--190",
journal = "Steel in the USSR",
issn = "0038-9218",
publisher = "Allerton Press Inc.",
number = "4",

}

RIS

TY - JOUR

T1 - OPTIMIZING ROLLING SCHEDULE FOR CHANNEL NO 12 ON 600 MILL

AU - Shilov, V. A.

AU - Fomin, A. V.

AU - Telyashov, N. V.

AU - Bodrov, E. M.

AU - Krivoruchko, N. N.

PY - 1990

Y1 - 1990

N2 - A procedure is proposed for optimising the rolling schedule for channel No. 12 on a 600 mill consisting of three three-high stands and a two-high finishing stand. A computer program was used to determine the actual pressure and force load on the mill equipment and to establish the reserves for intensifying the rolling schedule. Computer simulation made it possible to determine the optimum pass overlapping schedule and to increase mill throughput. Schedules for rolling sections and shapes on any linear mill can be optimised by the procedure described.

AB - A procedure is proposed for optimising the rolling schedule for channel No. 12 on a 600 mill consisting of three three-high stands and a two-high finishing stand. A computer program was used to determine the actual pressure and force load on the mill equipment and to establish the reserves for intensifying the rolling schedule. Computer simulation made it possible to determine the optimum pass overlapping schedule and to increase mill throughput. Schedules for rolling sections and shapes on any linear mill can be optimised by the procedure described.

UR - https://gateway.webofknowledge.com/gateway/Gateway.cgi?GWVersion=2&SrcAuth=tsmetrics&SrcApp=tsm_test&DestApp=WOS_CPL&DestLinkType=FullRecord&KeyUT=A1990FW34800014

M3 - Article

VL - 20

SP - 188

EP - 190

JO - Steel in the USSR

JF - Steel in the USSR

SN - 0038-9218

IS - 4

ER -

ID: 56234521