A schedule for heating the lining of 350 and 370 t steel casting ladles for after-furnace treatment has been developed. It can be implemented either by maintaining a constant dynamic head at the outlet from the burner passage at the first stage of heating, or by keeping the air flowrate constant at that stage.
Язык оригиналаАнглийский
Страницы (с-по)180-181
Число страниц2
ЖурналSteel in the USSR
Том20
Номер выпуска4
СостояниеОпубликовано - 1990

    Предметные области WoS

  • Металловедение и Металлургия

ID: 56234723