Dielectric Frequency Response (DFR) test application is one of the way spreading High Voltage bushing’s diagnostic possibilities during Service period. DFR bushing’s monitoring and statistic system are absence at present time. So it’s not possible to analyze massive results after bushing’s tests at electricity equipment. There is difficult practice question - how much kind of sensitivity method will influence on insulation condition on the future Service period? What features of the frequency response in the analysis indicate the presence of definite defects in the insulation system?
Translated title of the contributionHIGH VOLTAGE BUSHING’S FREQUENCY RESPONSE ANALYSIS IN SERVICE
Original languageRussian
Pages (from-to)17-21
Number of pages5
JournalЭнергетик
Issue number4
Publication statusPublished - 2024

    Level of Research Output

  • VAK List

ID: 58418115